Losing the copper under your panels?

POTS Replacement Device gives a building's fire and burglar panels a new phone line, and we need licensed alarm companies to connect it. One UL 864 listed unit has eight analog jacks, the building's internet first and cellular on two networks behind it. Your monitoring and service contracts stay yours.

POTS Replacement Device

Install order: 400 Example Avenue

Lines to move
Fire panel 2, burglar 1, elevator 2
Unit jacks
1 to 5, numbers on the line map
Before you leave
Test signal on every line to the monitoring center
Close-out
Photos, test results, fire department acceptance

An example install order, not a real job, with three things every POTS Replacement Device install includes:

  1. A line map first. Every number on the building's bill matched to its panel and to the unit jack it moves to, sent with the order.
  2. A test on every line. Each panel sends a test signal to its monitoring center before your tech leaves.
  3. A record we keep. Photos, test results and the fire department's acceptance, filed with the building.

What the job is.

One visit per building. Your tech moves phone cords, not panels, and tests what moved.

  1. Check the site and the panel

    Cell signal where the unit will sit, power within reach, and a room that stays between 32 and 104°F. Confirm the panel's format is on the unit's list before the visit.

  2. Move the cords

    Each panel's phone cord moves from the wall jack to one of the unit's eight RJ-11 jacks. Nothing else in the panel's wiring changes.

  3. Test and close out

    A test signal on every line to the monitoring center, an elevator call test where there are elevators, photos, then the fire department's acceptance.

What the unit gives your panels.

The specs a tech asks about first. The hardware sheet and the full format list come with the first install order.

Phone lines
8 analog (FXS) RJ-11 jacks with surge protection
Alarm formats
Contact ID, SIA, 4+2, Modem IIIa2
Also carries
Elevator phones, fax, modems, call boxes
Ways out
Building internet on the WAN port, then cellular on two SIMs, two networks
Standby battery
Built in, up to 24 hours
Fire listing
UL 864, fire alarm signaling
Where it goes
Indoors, 32 to 104°F, on a shelf or the wall, 9.8 in wide
Line health
Every line monitored; the building is alerted when one drops

Panels that hold the line open for listen-in audio aren't on the format list. Ask us before you quote one.

Settle these with the fire department first.

From NFPA 72, 2025 edition, for a panel that dials out. The local fire department decides; these are the questions to settle before the visit, not after. The full code summary.

  1. How the panel's two paths are arranged

    A panel that dials out connects to two separate means of transmission, so one failure doesn't take out both (26.6.4.2.5).

  2. Who the carrier of record is

    California's state fire marshal calls this the key question for owners, and a fire department may ask for it in the submittal.

  3. Backup power at the building

    Equipment at the building that sends alarm signals needs 24 hours of secondary power, or 8 with an accepted risk analysis (26.6.3.13).

  4. The test after the change

    The code's annex calls for authorized fire alarm service personnel to test the system whenever the phone service changes (A.3.3.172).

What your company gets.

Install work on buildings that have to move, and no competition for the alarm contract.

  • Paid installs

    Paid per building, for the survey, the cords, the tests and the close-out.

  • Referrals

    Paid for each building you bring us.

  • Your contracts stay yours

    We sell the phone lines. POTS Replacement Device does not install, service or maintain alarm systems, so your monitoring and service contracts aren't in play.

  • Work the letters create

    AT&T and Verizon are sending business customers dates to move their copper lines, and every panel on those lines is a job for a licensed tech. What the letters say.

Questions from alarm companies.

Checked . Call (385) 581-3080 if yours isn't here.

Do we need an alarm license?

Yes. Every panel connection goes to a company licensed for alarm work in the building's state, and we only send licensed partners.

What do we check on the panel first?

Its reporting format: the unit carries Contact ID, SIA, 4+2 and Modem IIIa2. Panels that hold the line open for listen-in audio aren't on that list, so ask us before quoting one.

Who owns the customer?

The building contracts with us for the phone lines. Its monitoring and service contracts stay with you, because POTS Replacement Device does not install, service or maintain alarm systems.

What does the fire department need to see?

The local fire department inspects and accepts the installation. Expect questions about the UL 864 listing, how the panel's two paths are arranged under NFPA 72, the carrier of record and the test results.

How are partners paid?

Installs are paid per building, and so are referrals. The amounts and when they are paid are in the partner agreement, which we send after you ask to partner.

Ask to partner.

Tell us where you're licensed. We reply to talk through your area and the first buildings.

Or call (385) 581-3080.

We reply by email or phone.